Muscle Wall was designed to be set up and taken down in as little time as possible. The lightweight of each wall, coupled with the intuitive design, allows Muscle Wall to be deployed and taken down with just a small team of workers and without the aid of heavy equipment. A 2-foot secondary containment big enough to house a standard frac tank can be set up in just 30 minutes.
Frac tanks in a system break down and need to be replaced all of the time. Muscle Wall's modular design enables a few walls to be quickly removed, allowing a broken down frac tank to be removed from the containment and replaced with a working tank in only minutes.