Installation
INSTALLATION GUIDES
The Muscle Wall deployment process has been rigorously tested and refined for multiple applications. The installation guides below have been split into two main categories: Wall Installation and Liner Deployment. If you need any assistance selecting which liner deployment method is right for you, please contact Muscle Wall support.
Wall Installation
These guides will walk you through the steps necessary to set Muscle Wall into place, secure together, and fill with water.
Liner Installation
These guides will walk you through the steps necessary to complete the installation after all of the Muscle Wall have been set in place, secured together, and filled with water. These guides will show liner being installed on 4-foot Muscle Wall, but the process will be the same for any Muscle Wall product line.
Chain Option
The chain option is our go-to for levee overtopping applications. It is a quick and easy installation and has the added benefit of extra protection for the bank during times of increased flow.